| Customization: | Available |
|---|---|
| Decarburization Technology: | Membrane Separation |
| Methane/CH4 Target Value: | 95~99% as Required |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Item | Quality Index | Comments | |
| High thermal value | MJ/m3 | >31.4 | In the specific geographical area for vehicle driving, under the highest operation pressure, the water dew point shouldn't be higher than -13 degree.C; When lowest ambient temperature lower than -8 degree.C, the water dew point should be 5 degree.C lower than the lowest temperature. |
| CO2 | % | ≤3.0 | |
| Total Sulfur | mg/Nm3 | ≤200 | |
| H2S | mg/Nm3 | ≤15 | |
| O2 | % | ≤0.5 | |
| Item | Equipment Name | Specifications | Qty | Comments |
| 1 | Primary Filter | 1Unit | ||
| 2 | Primary Cooler | 1Unit | ||
| 3 | Wet Desulphurization Tower | 1Unit | ||
| 4 | Secondary Filter | 1Unit | ||
| 5 | Dry Desulphurization Tower | 1Unit | ||
| 6 | Separator | 1Unit | ||
| 7 | Pregnant Groove | 1Unit | ||
| 8 | Regeneration Groove | 1Unit | ||
| 9 | Barren Liquor Groove | 1Unit | ||
| 10 | Sulfur Froth Groove | 1Unit | ||
| 11 | Underground Groove | 1Unit | ||
| 12 | Fine Cleaning System | 1 Set | ||
| 13 | First MS Assembly | 1 Batch | Imported | |
| 14 | Second MS Assembly | 1 Batch | Imported | |
| 15 | Buffer Tank | 1 Unit |
| Item | Equipment Name | Material | QTY | Comments |
| 1 | Biogas Blower | Case Iron | 2 Units | With back-up Anti-explosion |
| 2 | Desulphurization Pump | Case Iron +SS304 |
2 Units | With back-up Anti-explosion |
| 3 | Regeneration Pump | Case Iron +SS304 |
2 Units | With back-up Anti-explosion |
| 4 | Sulfur Froth Pump | Case Iron +SS304 |
2 Units | With back-up Anti-explosion |
| 5 | Supplement Pump | Case Iron +SS304 |
1 Unit | Anti-explosion |
| 6 | Biogas Compressor | Case Iron | 1 Unit | Anti-explosion, Variable frequency |
| 7 | CNG Compressor | Case Iron | 1 Unit | Anti-explosion, Variable frequency |
| 8 | Gas Dispenser | 1 Unit | Single line, Double nozzles & measuring | |
| 9 | Gas Odorization | 1 Unit |
| Item | Product Name | QTY | Comments |
| 1 | PLC Controlling Cabinet | 1 set | |
| 2 | PLC system | 1 set | |
| 3 | Operator Station | 2 units | |
| 4 | Complete On-line UPS | 1 unit | |
| 5 | Flow-meter | 2 units | |
| 6 | On-line analyzer | 2 units | |
| 7 | Pressure transmitter | 1 batch | |
| 8 | Pressure gauge | 1 batch | |
| 9 | Temperature gauge | 1 batch | |
| 10 | RTD | 1 batch | |
| 11 | Alertor | 1 batch | |
| 12 | Electrical control box | 1 batch |