Methane-Natural Gas Decarburization System/Biogas Purification Plant

Product Details
Customization: Available
CH4 Content: 97%
CNG Pressure: 20MPa for Gas Station
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
4000000 RMB
Plant Area
501~1000 square meters
  • Methane-Natural Gas Decarburization System/Biogas Purification Plant
  • Methane-Natural Gas Decarburization System/Biogas Purification Plant
  • Methane-Natural Gas Decarburization System/Biogas Purification Plant
  • Methane-Natural Gas Decarburization System/Biogas Purification Plant
  • Methane-Natural Gas Decarburization System/Biogas Purification Plant
Find Similar Products

Basic Info.

Model NO.
ALONG
Digester Capacity
2*5, 000 Cubic Meters Cstr
Ng Production
10, 000 Nm3/Day
Transport Package
LCL or FCL
Specification
Complete System
Trademark
ALONG BIOGAS
Origin
China
HS Code
8486909000
Production Capacity
100 Sets/Year

Product Description

Methane-Natural Gas Decarburization System/Biogas Purification Plant

Methane-Natural Gas Decarburization System/Biogas Purification Plant
Methane-Natural Gas Decarburization System/Biogas Purification Plant
Methane-Natural Gas Decarburization System/Biogas Purification Plant
Methane-Natural Gas Decarburization System/Biogas Purification Plant
Methane-Natural Gas Decarburization System/Biogas Purification Plant
Methane-Natural Gas Decarburization System/Biogas Purification Plant
Methane-Natural Gas Decarburization System/Biogas Purification Plant
Methane-Natural Gas Decarburization System/Biogas Purification Plant
Methane-Natural Gas Decarburization System/Biogas Purification Plant
Methane-Natural Gas Decarburization System/Biogas Purification Plant

Methane-Natural Gas Decarburization System/Biogas Purification Plant

After two-stage desulphurization processes, then go through our GasDec system for carbon removal, biogas could be upgraded to make CNG, for vehicle or going into national pipeline network.

The gas quality after upgrading as below:
Item Quality Index Comments
High thermal
value
  MJ/m3 >31.4 In the specific geographical area for vehicle driving, under the highest operation pressure, the water dew point shouldn't be higher than -13 degree.C; When lowest ambient temperature lower than -8 degree.C, the water dew point should be 5 degree.C lower than the lowest temperature.
CO2 % ≤3.0
Total Sulfur mg/Nm3 ≤200
H2S mg/Nm3 ≤15
O2 % ≤0.5
Comments: The above data is subject to clients' actual requirements.

The Flowchart of biogas upgrading system



Procedures of our biogas upgrading system
 
1, Biogas Generation
Biogas is generated in anaerobic reactor and stored in gas holder in low pressure. Boosted by biogas blower, biogas is delivered to wet desulphurization tower;
 
2, Wet Desulphurization
Wet chemical desulphurization technology is mainly structured as a single tower. Chemicals adopted is Na2CO3 with addition of catalysts (oxygen carrier). Chemicals is dissolved in the water, contact rightabout with biogas in the tower. More than 95% hydrogen sulfide, a small amount of carbon dioxide and other acidic substances can be absorbed by the liquid.

The pregnant solution (the liquid) would be boosted by pump to a special groove, sprayed and oxidized by means of air suction for regeneration. Meanwhile elemental sulfur is precipitated out of the liquid, to be recycled for sale.
 
3, Dry Desulphurization
Dry chemical desulphurization technology is for the purpose of fine desulphurization, mainly structured as double towers, can be used alternately or operated in parallel or in series. Chemicals adopted is usually ferric oxide. Hydrogen Sulfide is converted to solid sulfide.
 
4, Gas Cleaning
The gas is boosted by biogas compressor, then after procedures of cooling, water and impurities removal, to be delivered to decarburization unit.
 
5, Biogas Decarburization
The decarburization technology we adopt is chemical absorption. Chemical solution contacts with biogas rightabout in the absorption tower, to absorb carbon dioxide till its content lower than 3%.

The upgraded gas is discharged from top of absorption tower, to be cooled by cooler and cleaned by separator for the removal of condensate water and chemical solution. Then gas is delivered to compressor.

The pregnant solution (the liquid) returns to the regeneration tower. The precipitation of carbon dioxide is achieved through steam stripping. The precipitated carbon dioxide gets through cooler and separator, can be discharged into atmosphere directly. The barren solution from the bottom of regeneration tower is pumped through automatic flow monitoring pipeline into absorption tower for circulatory use.


This is our GasDec system.
 
1,  NG Compressor
The gas after decarburization procedure we can call it natural gas now. Its pressure rises to 22MPa or other pressure levels by natural gas compressor.
 
2, NG Cleaning
The compressed natural gas would be dried and cleaned further by automatic NG drier. The working principle of drier is pressure swing absorption, taking 4A molecular sieve as absorbent.
 
3, CNG Metering
CNG metering device is required when gas is for sale. Measuring method we usually adopt mass measurement. Eg. The mass flowmeter of our project in Henan Province of China is Emerson CNG050, accuracy could reach 0.5 magnitude. Gas is filled into CNG tank lorry through gas dispenser machine, to be delivered to standard CNG station (or Primary CNG station) as fuel for vehicle.

Main equipment list of our upgrading system
No. Item Comments
Biogas Desulphurization System
1 Wet Desulphurization Tower  
2 Groove,Pregnant Solution  
3 Groove,Barren Solution  
4     Groove,regeneration  
5 Separator  
6 Dry Desulphurization Tower  
7 Regeneration Pump  
8 Pump,Desulphurization  
9 Pump,Sulfur Foam  
10 Biogas Blower  
11 Electrical Monitoring  
12 Alarming System  
Biogas Decarburization System
1 Pump,barren Solution  
2 Decarburization Tower Methane Recovery: ≥99%,
Gas quality satisfies GB18047-2000 standard
3 On-line Analyzer  
4 On-site control box  
5 PLC System  
6 Operator Station  
7 On-line UPS  
8 Automatic flowmeter  
9 Motorized Valve  
10 Pressure Transmitter  
11 On-site Pressure Gauge  
12 On-site Temperature Gauge  
13 Liquid level Gauge  
14 Frequency Converter  
15 Filter  
16 Storage Tank  
17 Underground Groove  
18 Underwater Pump  
19 Biogas Compressor  
20 Power Distribution Cabinet Assembling Unit
CNG Compressing, drying and metering Unit
1 CNG Compressor  
2 Dryer  
3 Gas Dispenser Machine  
Circulatory Cooling Water Unit
1 Circulatory water system  

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier