Custom-Made Biogas Pre-Treatment System/Biogas Scrubber

Product Details
Customization: Available
Biogas Flow: 20~300 Nm3/H
Controlling: VFD with LCD Display
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
4000000 RMB
Plant Area
501~1000 square meters
  • Custom-Made Biogas Pre-Treatment System/Biogas Scrubber
  • Custom-Made Biogas Pre-Treatment System/Biogas Scrubber
  • Custom-Made Biogas Pre-Treatment System/Biogas Scrubber
Find Similar Products

Basic Info.

Model NO.
ALONG BIOGAS -GasCle
Biogas Application
for Biogas Generator, Torch or Boiler
Warranty
One Year
Pressure
Constant Pressure Feed to Generator
Tank Material
Stainless Steel 304 or Carbon Steel
Blower
Anti-Explosion, Variable Frequency Motor
Connection Pipes
PVC or Stainless Steel Pipes
Auxiliary
Pressure Guage, H2s Sensor, Ss Flange,etc
Project Site
French
Transport Package
LCL or FCL
Specification
Complete System
Trademark
ALONG BIOGAS
Origin
China
HS Code
8486909000
Production Capacity
100 Sets/Year

Product Description

Custom-Made Biogas Pre-Treatment System/Biogas Scrubber

Our GasCle system is for the pre-treatment of raw biogas from anaerobic reactor, suitable for biogas flow 20 ~ 300 Nm³/hr. The raw biogas from digester always contains saturated water vapor, physical impurities and hydrogen sulfide.

These substances should be removed before the utilization of biogas, to avoid damage to generator, burner of boiler and torch or other equipment.

The GasCle system is skid mounted in combination of multiple functional units, or individually installed at project site.

GasCle system has the following modules:
1.  Primary filter (optional)
For preliminary removal of physical impurities and saturated water vapor;

2.  Desulphurization tank.
For reducing the hydrogen sulfide content in biogas, to meet the requirements of follow-up equipment;

3.  Secondary filter.
For Precise removal of physical impurities in the biogas and moisture;

4.  Biogas blower
Increasing biogas pressure for transportation and meed the requirement of follow-up equipment for gas intake pressure;
5.  Electrical control system
Equipped with VFD(variable frequency drive) and LCD touch screen.
- Pressure gauge and H2S analyzer(Optional).
-  Pipes, valves and base frame.

GasCle system has the following functions:

1.  Desulfurization
Hydrogen sulfide can be reduced to 50ppm or less;

2.  Dehydration
Removal of saturated water vapor;

3.  Impurity removal.
Removal of physical impurities and volatile matter of desulphurizer agent;

4.  Pressure increasing
Increment could reach 39.8 kPa or even higher;

 
5. Pressure stabilization
Stabilizing gas outlet pressure at a fixed value to meet the gas intake pressure requirement of the follow-up equipment;

6.  Measurement of Pressure and hydrogen sulfide content (optional);

7.  Digital display.
Pressure setpoint, gas outlet pressure, motor frequency, motor speed, motor current, output torque, bus voltage, output voltage, power consumption and system operation time would be indicated on the LCD display.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier