Membrane Separation Biogas-Natural Gas Purification Decarburization System

Product Details
Customization: Available
Methane/CH4 Target Value: 97~99% as Required
CNG Pressure Output: 20MPa or Other as Required
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
4000000 RMB
Plant Area
501~1000 square meters
  • Membrane Separation Biogas-Natural Gas Purification Decarburization System
  • Membrane Separation Biogas-Natural Gas Purification Decarburization System
  • Membrane Separation Biogas-Natural Gas Purification Decarburization System
  • Membrane Separation Biogas-Natural Gas Purification Decarburization System
  • Membrane Separation Biogas-Natural Gas Purification Decarburization System
Find Similar Products

Basic Info.

Treatment Capacity
50~10000 Nm3/Hr
Transport Package
LCL or FCL
Specification
Complete System
Trademark
ALONG BIOGAS
Origin
China
HS Code
8486909000
Production Capacity
100 Sets/Year

Product Description


Membrane Separation Biogas-Natural Gas Purification Decarburization System

Membrane Separation Biogas-Natural Gas Purification Decarburization System
After two-stage desulphurization processes, then go through our GasDec system (Membrane Separation) for carbon removal, biogas could be upgraded to make CNG, for vehicle or going into national pipeline network.

The gas quality after upgrading as below:
Item Quality Index Comments
High thermal value MJ/m3 >31.4 In the specific geographical area for vehicle driving, under the highest operation pressure, the water dew point shouldn't be higher than -13 degree.C; When lowest ambient temperature lower than -8 degree.C, the water dew point should be 5 degree.C lower than the lowest temperature.
CO2 % ≤3.0
Total Sulfur mg/Nm3 ≤200
H2S mg/Nm3 ≤15
O2 % ≤0.5
Comments: The above data is subject to clients' actual requirements.


The Flowchart of biogas upgrading system
Membrane Separation Biogas-Natural Gas Purification Decarburization System


Procedures of our biogas upgrading system:
1, Primary Filter
The saturated water and partial particles in the raw digester gas are removed through the primary filter;

2, Boosting, Primary desulphurization
The biogas from primary filter is boosted by blower. Then after cooling, the biogas is fed to wet type desulphurization system for primary removal of Hydrogen Sulfide, to make H2S content lower than 200 mg/Nm3;
 
3, Fine desulphurization
The content of Hydrogen Sulfide is made lower than 50 mg/Nm3 through dry type desulphurization system;
 
4, Impurities Removal, Fine Cleaning System
The new dust and impurities in biogas could be removed through the Separator; Then delivered to Fine cleaning system for removals of water and tiny particles in order to protect membrane and guarantee its life-time;

5.  First MS (Membrane Separation)
The high quality compressed biogas goes into the first MS system through gas-distributing pipeline. The exhaust gas could be gathered or discharged into atmosphere;

6.  Secondary MS (Membrane Separation)
The gas out of First-MS goes into Secondary MS system for final decarburization. The exhaust gas would totally return to the inlet of biogas compressor. Thiophane is added into the cleaned gas, after CNG compressor, through dispenser, to be delivered to gas station by tank lorry;

Membrane Separation Biogas-Natural Gas Purification Decarburization System

Main equipment list of our upgrading system
1.  Main non-standard equipment
Item Equipment Name Specifications Qty Comments
1 Primary Filter   1Unit  
2 Primary Cooler   1Unit  
3 Wet Desulphurization Tower   1Unit  
4 Secondary Filter   1Unit  
5 Dry Desulphurization Tower   1Unit  
6 Separator   1Unit  
7 Pregnant Groove   1Unit  
8 Regeneration Groove   1Unit  
9 Barren Liquor Groove   1Unit  
10 Sulfur Froth Groove   1Unit  
11 Underground Groove   1Unit  
12 Fine Cleaning System   1 Set  
13 First MS Assembly   1 Batch Imported
14 Second MS Assembly   1 Batch Imported
15 Buffer Tank   1 Unit  

2.  Main Operation Equipment List
Item Equipment Name Material QTY Comments
1 Biogas Blower Case Iron 2 Units With back-up
Anti-explosion
2 Desulphurization Pump Case Iron
+SS304
2 Units With back-up
Anti-explosion
3 Regeneration Pump Case Iron
+SS304
2 Units With back-up
Anti-explosion
4 Sulfur Froth Pump Case Iron
+SS304
2 Units With back-up
Anti-explosion
5 Supplement Pump Case Iron
+SS304
1 Unit Anti-explosion
6 Biogas Compressor Case Iron 1 Unit Anti-explosion, Variable frequency
7 CNG Compressor Case Iron 1 Unit Anti-explosion, Variable frequency
8 Gas Dispenser   1 Unit Single line, Double nozzles & measuring
9 Gas Odorization   1 Unit  
Membrane Separation Biogas-Natural Gas Purification Decarburization System


3.  Instruments & controlling
Item Product Name QTY Comments
1 PLC Controlling Cabinet 1 set  
2 PLC system 1 set  
3 Operator Station 2 units  
4 Complete On-line UPS 1 unit  
5 Flow-meter 2 units  
6 On-line analyzer 2 units  
7 Pressure transmitter 1 batch  
8 Pressure gauge 1 batch  
9 Temperature gauge 1 batch  
10 RTD 1 batch  
11 Alertor 1 batch  
12 Electrical control box 1 batch  


Membrane Separation Biogas-Natural Gas Purification Decarburization System

Main Monitoring Locations:
Item Main Equipment Instrument Content
1 Primary Filter Pressure Pressure, raw biogas
Temperature Temp. raw biogas
Manual monitoring of H2S H2S content, raw biogas
2 Biogas Blower Pressure Outlet pressure, raw biogas
3 Wet Desulphurization Tower Temperature Temp. feed gas
Pressure Pressure, outlet
Manual monitoring of H2S H2S content, feed gas
4 Dry Desulphurization
Tower
Temperature Temp. feed gas
Pressure Pressure,feed gas
5 Fine Cleaning System Manual monitoring of H2S H2S content, feed gas
Flow detection Inlet flow
Pressure Pressure,feed gas
6 Pumping Temperature Temp. solution
Pressure Pressure, pump outlet
7 Compressing
(Biogas&CNG compressors)
Temperature monitoring Temp. compressor overall inlet
Temp. compressor inlet
Temp. compressor outlet
Temp. Compressor overall outlet
Temp. lubrication
Temp. circulation water
Pressure monitoring Pressure. compressor overall inlet
Pressure. compressor inlet
Pressure. compressor outlet
Pressure. Compressor overall outlet
Pressure. lubrication
Pressure. circulation water
8 Membrane Assembly Pressure monitoring Pressure. Inlet
Pressure. outlet
Temperature monitoring Temp. Inlet
Temp. outlet
Analyzer CO2 content, product gas
CH4 content, product gas
9 Gas Dispenser Flow Flow. Inlet
Flow. outlet
10 Circulation Water Pressure monitoring Pressure. Inlet
Pressure. outlet
Temperature monitoring Temp. Inlet
Temp. outlet
11 Interconnected Controlling   Interconnected controlling of biogas compressor, CNG compressor and circulation water system
12 Other Controlling   Alarm. Methane leakage
Alarm. H2S leakage

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier