Customization: | Available |
---|---|
Decarburization Technology: | Membrane Separation |
Methane/CH4 Target Value: | 95~99% as Required |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Quality Index | Comments | |
High thermal value | MJ/m3 | >31.4 | In the specific geographical area for vehicle driving, under the highest operation pressure, the water dew point shouldn't be higher than -13 degree.C; When lowest ambient temperature lower than -8 degree.C, the water dew point should be 5 degree.C lower than the lowest temperature. |
CO2 | % | ≤3.0 | |
Total Sulfur | mg/Nm3 | ≤200 | |
H2S | mg/Nm3 | ≤15 | |
O2 | % | ≤0.5 |
Item | Equipment Name | Specifications | Qty | Comments |
1 | Primary Filter | 1Unit | ||
2 | Primary Cooler | 1Unit | ||
3 | Wet Desulphurization Tower | 1Unit | ||
4 | Secondary Filter | 1Unit | ||
5 | Dry Desulphurization Tower | 1Unit | ||
6 | Separator | 1Unit | ||
7 | Pregnant Groove | 1Unit | ||
8 | Regeneration Groove | 1Unit | ||
9 | Barren Liquor Groove | 1Unit | ||
10 | Sulfur Froth Groove | 1Unit | ||
11 | Underground Groove | 1Unit | ||
12 | Fine Cleaning System | 1 Set | ||
13 | First MS Assembly | 1 Batch | Imported | |
14 | Second MS Assembly | 1 Batch | Imported | |
15 | Buffer Tank | 1 Unit |
Item | Equipment Name | Material | QTY | Comments |
1 | Biogas Blower | Case Iron | 2 Units | With back-up Anti-explosion |
2 | Desulphurization Pump | Case Iron +SS304 |
2 Units | With back-up Anti-explosion |
3 | Regeneration Pump | Case Iron +SS304 |
2 Units | With back-up Anti-explosion |
4 | Sulfur Froth Pump | Case Iron +SS304 |
2 Units | With back-up Anti-explosion |
5 | Supplement Pump | Case Iron +SS304 |
1 Unit | Anti-explosion |
6 | Biogas Compressor | Case Iron | 1 Unit | Anti-explosion, Variable frequency |
7 | CNG Compressor | Case Iron | 1 Unit | Anti-explosion, Variable frequency |
8 | Gas Dispenser | 1 Unit | Single line, Double nozzles & measuring | |
9 | Gas Odorization | 1 Unit |
Item | Product Name | QTY | Comments |
1 | PLC Controlling Cabinet | 1 set | |
2 | PLC system | 1 set | |
3 | Operator Station | 2 units | |
4 | Complete On-line UPS | 1 unit | |
5 | Flow-meter | 2 units | |
6 | On-line analyzer | 2 units | |
7 | Pressure transmitter | 1 batch | |
8 | Pressure gauge | 1 batch | |
9 | Temperature gauge | 1 batch | |
10 | RTD | 1 batch | |
11 | Alertor | 1 batch | |
12 | Electrical control box | 1 batch |